The Global Database of Data Center Industry Expertise
Started by John Laban. Last reply by Thorsten Punke Feb 8, 2010. 3 Replies 0 Likes
Add a Comment
Micah, Good morning,
Here in the datacenter we design a infraestructure with 1200 horizontal UTP and 576 fiber SAN with the cross connect in 2 - 42 RU one of fiber and other UTP, front and back to acomodate horizontal UTP because the space was the problem here, underfloor we put 6 ZDA to delivery in the EDA to the Blades IBM Power, DMX EMC, Library, the infraestructure its very funcional and the downtime its zero this project have 1 year, today im design a infraestructure to 120 - 44 RU and Cross connect in 18 - 58 RU Knurr, 2 patch cords (server>x-connect>swich) for me its a very good layout because i have the under floor very clean and i reduce the cost of OPEX in the future, good chat!
3 Patch cords it´s the bether solution in your opinion? (switch, X-connect and server), because for me it´s a very good solution for data center, you agree?
Welcome to
The Data Center Professionals Network
Connecting data center industry professionals worldwide. Free membership for eligible professionals.
© 2024 Created by DCPNet Admin. Powered by
You need to be a member of Cable Infrastructure to add comments!