final 36 - 40 racks, (2) PODS. Each pod can support 80kW of critical load in any non-specific rack density configuration. Day one, highest per-rack density is 12.5kW but is limited only to the total output in each POD. Total room dimensions 40x40. Thanks for the feedback, I hope to have a pic of the day 1 final soon